IBLS Journal 1956

From IBLS
Revision as of 23:29, 25 March 2013 by Dnevil (talk | contribs) (Created page with " == GGLS Planning New Track == By August of 1956 discussion was underway as to whether a planned ground track at Redwood Park should be 7 1/4" gauge or 7 1/2.")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

GGLS Planning New Track

By August of 1956 discussion was underway as to whether a planned ground track at Redwood Park should be 7 1/4" gauge or 7 1/2.