Greenly’s Hudson: Difference between revisions

From IBLS
Jump to navigation Jump to search
Line 36: Line 36:


== Documents ==
== Documents ==
* [http://ibls.org/files/2022/GreenlyHudson/cylinder-assem-001.x_t <i>Hudson</i> Cylinder Assembly 3D model in Parasolid (X_T) Format]
* [http://ibls.org/files/2022/GreenlyHudson/SLIDE-VALVE-CYLINDERS.pdf <i>Hudson</i> Cylinder Drawings (PDF)]


== Gallery ==
== Gallery ==

Revision as of 14:20, 1 April 2022

Jim Mullner

March 2022

Drawing Corrections

Eccentric Rod Length

Error noted on drawing AH8 - eccentric rod is 11-1/8 inches long not 10-1/8 inches long. I spent about 3 hours chasing it down today. I would hate to build this without first modeling it entirely in CAD. I had to scale the print to find the error.

GreenlyHudsonEccentricRodLenErr.jpeg

Rod Interference

Found another fairly obvious interference issue. The reversing shaft interferes with the coupling rods (see drawing AH14).

I had just completed an animation of the Baker valve gear when I noticed it. The Baker valve gear was a quality job except for the eccentric rod and drop arm.

GreenlyHudsonValveGearMistake.jpeg

Smokebox Door

This is not an error, per se, but worth noting. Greenly's drawing number AH20 is a bit sparse, but it looks like there are two working dogs, and those are at 3 o'clock and 9 o'clock. The other dogs are just lining up against the edge of the door and do not actually clamp it down. Perhaps the intent was to make it less tedious to open the smokebox door. British prototypes use a single rotating locking mechanism on the center of the smokebox door, so it appears this was Greenly's solution to simplify access while retaining the look and feel of the American prototype.


Documents

Gallery