Minnie 2 is a freelance 2-4-2 live steam locomotive designed by Bill Oberpriller.

Bill Oberpriller and his Minnie

Bret Kueber

Bret Kueber published the following photos of his version of Minnie in 2000.

Bill Oberpriller provided us with fantastic tech support via Email, and his products are first rate. Allen Models, What can I say, Gene has been extremely helpful, and my order ALWAYS arrived promptly. We never had a problem with any of the castings we purchased from him.
# 13 (2-4-2) Coal Fired Columbia Class steam locomotive (Built 5/1999)

Jim Cook

Jim Cook published the following build log for his Minnie in 2002.

Frame

This design first appealed to me because of its general shape. To me, it looks as if it is an engine from the last half of the 1800's. The diamond stack, large headlight and cow catcher gives it character.

From a first time builder's point of view, the 2-4-2 configuration fits well. All the castings will be from the tried and true Allen Models. The designer is attempting to reduce the number of parts. This should help keep the cost and time necessary to build the engine down.

I purchased the first kit. It is for the frame. The quality of the punched parts is very good. I was able to put both side rail together during a Saturday. The rear bearing housing, front bearing housing and equalizer and the front and back frame spacers have been received and completed. In the first picture you can see the front axle mounted in the equalizer bearing boxes.

Minnie 2 front frame assembly.

The second picture shows the rear axle in their bearing boxes. These boxes are attached directly to the frame.

Minnie 2 rear axle assembly.

Note that the the axles (1 inch diameter) were machined on the ends to accept the drivers at this time.

I ordered the four driver bearing assemblies from a local bearing supplier and received them within a few days. The castings were ordered from Allen Models. I received all the wheels and valve rough castings by the end of October.

This is a view of the frame as of the end of the second week in December. The drivers have been machined and mounted on the axles. This is taken from the rear right.

Minnie 2 frame assembly.

I am now working on the valve gear. I have not finished the four eccentrics and straps. I have a Sherline lathe and mill that I use for the small stuff. I just got a 9 inch swing Jet lathe and I'm setting this up for the larger items.

Minnie-2-Frame-2.jpg

To give you an idea of scale, the main drivers are 8.5 inches in diameter. I was able to turn these on my friend Jerry Johnson's large lathe. He also helped me broach the key slot and quarter the wheels.

The trailing truck has a nice set of spoked wheels whose axle runs in Oilite bearings. There is plenty of movement, left and right and up and down.

Minnie-2-Trailing-truck.jpg

Boiler

Here the boiler has been set in place. There is a plate welded to the front face of the fire box that anchors it to the frame. The front portion of the boiler has a sliding fit into the smoke box. This allows movement of the boiler as it expands and contracts.

Note the fittings at each lower corner of the firebox. This will allow proper cleaning of the mud ring.

The smoke stack has been mounted but the top half has not been machined.



Ron Thibault

Ron Thibault published the following build log for his Minnie in 1998.

Tender Trucks

After talking to Bill, I decided to start construction of the engine with the tender trucks. He recommended Cannonball's Archbar trucks. After also looking at other companies castings, I agree! Cannonball has a good reputation, and their kit is also the least expensive! I like that combination!! The complete kit with all materials required is only $175.00 (they are also available RTR at $355.00). In addition I will order a wheel gauge template for 7.5" track, and the 29/32" drill needed for the bearing pockets. The drill is a standard drill that you can get elsewhere, if you desire. This brings the total to $199.00 plus about $10.00 shipping. Figure 1 is the picture of a completed truck from Cannonballs catalog. Note: My wheels are the plain back type rather than the fluted ones. This made machining for a novice (me) a little easier and should not be noticeable on the finished tender. In addition the trucks can be built with a lathe, drill press, and file. I do not have a milling machine, so this combination fits my available resources.

When I was inspecting the parts after they arrived I noticed that the lower "bar" on the cast frames was much thinner than the other "bars". This seemed strange, I have not noticed this in pictures of other company's kits which I thought had all the bars the same thickness. I pulled out my copy of Meyer's "Modern Locomotive Construction 1892" and looked up tender trucks. Lo and behold, the trucks in the book also had thinner lower bars!! So these castings are quite prototypical! The rest of the parts were all of good quality, with no visible defects.

Tender Truck Sideframes

I started on the trucks with the cleanup and filling of the truck frames. I clamped a casting in my trusty WorkMate, and started filling (Figure 1). I've never filed cast aluminum before and quickly discovered the difference between it and steel! The file loaded up with globs of the soft aluminum at intervals between one and "X" strokes! After consulting the Live Steam E-mail forum I'm on, the following solutions were recommended: Coat the file with motor oil or Kerosene, use chalk as a lubricant, and clean the file with a file card. As I do not wish to get petroleum products on my "woodworking" WorkMate, I tried the chalk and card file route. I tried blackboard chalk, but most of it fell off with the first stroke. So I applied a very light coat of oil then applied the chalk. This worked a little better, but frequent use of the file card is needed. I understand that the type of chalk used for chalk lines sticks better, but I did not want to get blue chalk dust everywhere in my shop. Do not use the RED variety, it is a permanent type that will stay on whatever it contacts. I could not find any of the white type.

I found the file card at Sears in the tool department. It is a block of wood with one side covered with steel bristles, like a wire brush, but with the bristles bent on the ends. You run this over the file, pulling it. So the wires travel in the direction the tips point toward. Use a fair amount of pressure.

This initial filing was to remove the parting line flash, and enough of the pattern draft to make the "bars" look like flat bar. I did not file them dead flat, as the more material left the stronger the final piece.

Truck Wheels

The cast iron wheels have a very tough skin that I would recommend using carbide tool bits on. Even with carbide I reserved one for the initial cutting and used a second bit for the finishing cuts. Also a 5 inch three jaw chuck is the minimum required to hold the wheel during the initial machining. The jaws on a 4 inch chuck might hold a wheel, but the jaws would be only minimally engaged with the scroll. This might over strain either the jaw threads or the scroll itself.

Cannonball recommends three different ways to mount the finished wheel to the axle:

  1. Press fit between the axle and the wheel hub hole.
  2. A non press fit using Loctite to secure the joint.
  3. Two setscrews 90 degrees apart with matching flats on the axle.

With any of the above a consistent hole size in the wheel means that the axles can be turned to the same diameter not individually tailored to match a particular wheel. To insure a consistent axle hole in the wheels, I used a 9/16ths inch reamer for the final cut. For now I plan to go with the press fit option for six of the wheels, with two of the wheels held by Loctite, one each, on the axles that the water pump sprockets will go.

Figure 13: Carbide Bits

A wheel was placed in the 3 jaw chuck with the front face against the jaws. I then used a carbide AL4 bit (left bit in Figure 13) and trued up the circumference of the flange area taking a cut about 0.010" deeper than the lowest spot on the back of the wheel at about 200 rpm (in backgear), using the bit I had designated for the roughing operation. By under cutting the skin on the flange edge first I was able to eliminate the interrupted cut that occurred at the start of each facing operation without doing this. This interrupted cut was caused, of course, by the slightly out of round edge of the casting. By taking a deep enough cut to get below the lowest spot the truing operation cut without an interrupted cut. With this edge trued up the facing operations that followed started on a machined surface, not a rough casting surface.

With the outer circumference machined I next a facing cut about 0.010" deeper than the lowest spot on the back of the wheel. Starting at about 200 rpm (in backgear), using the same roughing bit. When I had cut about halfway across I stopped the lathe and set the speed at the next higher setting, about 300 rpm. After the first cut had removed the skin, I exchanged the first bit for the one reserved for the finishing cuts. I then continued facing the back (at 300 rpm) with 0.015" to 0.020" cuts until the total thickness of the wheel was a little under 0.880".

Next I center drilled the back of the wheel, for the start of the axle hole with a #5 centerdrill at about 400 rpm. I followed this with a 7/32 inch drill for a pilot hole. I then step drilled the hole with a 1/2 inch and 17/32 inch drills. Then with the lathe in the lowest backgear speed (28 rpm on mine), I brought the hole to size with the 9/16ths reamer, held in the tailstock drill chuck. I finished by using a D4 bit (right bit in Figure 13) to debur and chamfer the opening to the hole. The burrs on the edges of the flange area were smoothed with a file. The edge away from the chuck was smoothed with the lathe running (about 300 RPM), and the other with the wheel turned by hand. The hand rotation was done because that edge was to close to the jaws to safely run the lathe under power.

Next the wheel was chucked in the 3 jaw with the machined back against the jaws. The front of the wheel was then faced to bring the total thickness down to 0.800". The Cannonball drawing shows a range of between 0.812" and 0.750". I left the wheels on the "fat" side in case I make a mistake later, and need a little metal left to correct it. The axle hole edge was chamfered and the inner and outer edges of the wheel face smoothed with the file (under power).

This was repeated for the other 7 wheel castings.

The Wheel Arbors section describes the fabrication of arbors for the Tender, Trailing Truck, Pilot Truck, and Drivers.

The next step was to clamp a wheel to a stub arbor and rough turn the tread area, then using a form tool finish turn the flange. Finally the tread area is coned to the 3 degree angle. After getting advice from several fellow model railroaders I decided to do all the machining operations on the wheels before installing them on the axles.

Alternately you could rough turn the wheels. Then after the wheels are in place on the axle the wheels are finish turned with the axle held between centers.

As the Wheel Arbor holds each wheel concentrically, the wheels were exchanged in turn until each operation was completed for all the wheels. Then the next machining operation was performed in the same manner.

Figure 12: Initial tread rough cut. Drawing by Rob Thibault

The first operation is to turn the tread area of the wheel. In this case I turned the wheels all the way down to the 4.125 (4 1/8") dimension, but not all the way over to the beginning of the inner flange radius. This area will be removed when the coning operation is completed, so this is really still a rough turning operation.

Each wheel for all operations was mounted with the back of the wheel facing the headstock. The wheels can vary slightly in overall width, but the flange must be machined in a fixed relationship to the wheel back, in order for proper tracking on the rails. Mounting the wheels in the above manner insures that the above relationship will be assured for all the wheels, if the proper stops are setup during the machining. The flange tool that will be used for the final cutting also assumes this mounting orientation.

Figure 14: Carriage stop for turning wheels.

The first step in turning the tread is to set up a fixed carriage stop for the locating the point between the tread and the first rough cut for flange (Point "A" in Figure 12). With this stop in place only the final diameter of the tread has to be watched during machining. The bottom of the way is protected by a piece of craft (or popsicle) stick. While the first wheel was machined I found that the chips built up quickly between the stop and the carriage and were difficult to remove due to the limited space. So I changed the setup to that shown in Figure 14 (again with a craft stick used to protect the way). With this setup almost all (or frequently all) the chips fell away from the edge of the block, requiring only the occasional clearing of the chips.

With the stop set the first wheel was turned to the desired diameter measuring carefully for the last cut. With this final cut finished the crossfeed dial was set to 0 (zero). The rest of the wheels were then turned with the final cut done at the zero setting, rather than measured. Doing the final cut this way requires that the toolbit always be the same size (no wear allowed). The skin on the cast iron wheels is quite tough and chewed up a HSS bit almost immediately, so all the following operations (until noted later), were done using an indexable carbide toolbit and holder. This bit showed no appreciable wear, and if it had, going to a new cutting edge does not require resetting the zero point and stop location.

Figure 15: Tread cutting operation.

Figure 15 shows the tread cutting operation in progress. You will note that the bit is being fed in with a left-hand bit parallel to the lathe axis. With the triangular bit this cut the part from under the skin (as is recommended practice), reducing greatly the wear and cutting force required. With the above setup the skin is mostly broken away from behind rather than cut through.

After the final diameter was reached the tool bit was cranked out to cut the "vertical" edge, again removing any skin from below and establishing a fixed point "A" for all the wheels.

The next operation is to cut an angled face in preparation for roughing in the flange to tread fillet. With this cut all the cast iron skin should be removed, allowing a HSS tool to be used to cut the rough fillet.

Figure 17

For this cut I used a right-hand bit, once again run in point first. The topslide was set over 30 degrees clockwise to produce the 60 angle desired (Figure 17). While there is probably some well accepted method for locating the tool to end up at the final cutting point, I do not know it. For these cuts I locked the carriage and used only the cross and topslide feeds. To get the proper settings I carefully cut the first wheel and when I finished the cuts and the point of the tool was sitting at point "A", I zeroed the crossfeed and topslide dials.

Figure 18

To make the cuts the cross slide was advanced and then the tool bit run in until it broke out at the end of the cut. As the last few cuts were made I took care not to run the topslide past the zero mark. When the carriage dial reached zero the last cut was being made. Figure 18 shows a wheel after the final cut was finished.

Locomotive Frame

Minnie's frame differs from the "standard" construction methods traditional to the Live Steam hobby. The two traditional 1 1/2 inch scale methods (at least for American prototypes) are to either mill the frame from 1/2 inch steel flat stock, or to build the frame from sections of barstock. The frame from flatstock requires that you either have a decent size milling machine, a good supply of endmills, and several days of time, or that you have $100 or more to have them cut for you. The barstock method does not need a milling machine (though one helps tremendously), but does involve many precise cuts and accurate drilling to many pieces of barstock. In either case you still need to mill the journal boxes.

The major components of Minnie's frame on the other hand requires no more complex a machine than a drill press! Even this could be dispensed with a by talented person with a hand drill. I fall under the drill press standards, though. The frame consists of a sandwich of two punched 1/8 inch thick steel plates, with 1/4 inch barstock between them. All the required openings and (pilot) holes for all the bolts are already punched in the 1/8 inch plates on a CNC punch press! All that the builder needs to do to produce a strong square frame is drilling, countersinking (for flat head screws), taping, and noncritical trimming of the barstock! The bearing retainers for the axle bearings and the front axle equalizer are also assembled from punched plates. Additionally the crosspiece and outer bearing plates for the front equalizer assembly are jig welded before delivery! The accuracy of the frame comes from the accuracy of the CNC punching, and makes it much easier for the first time (or tenth time) builder.

The total time for me to assemble the first frame side was 6 hours, start to finish! I did not trim the barstock to final size, but that was because I do not yet have the full set of drawings. I left the trimming until I am sure I'm not cutting off something I may need later!

Some precautions do need to be taken before construction begins. The punching process can cause some warpage. To account for this the plates are punched in pairs. By matching the pairs, any warpage will be canceled out. Therefore I compared the plates and selected and marked each one as to its final position in the assembled frame. The pairs were matched so that they looked like Figure 1 from the top. When these are bolted together the bowing in each piece will be canceled out. I did not want them to look like Figure 2. As the warpage there would be reinforced by the plates when bolted together!.


The other precaution is that one plate be selected as an inner and one as an outer (with respect to their position in the completed frame). Both inner pieces are tapped for the assembly bolts and the outer plates are clearance drilled and countersunk for the bolts. Mixing them up or drilling out where taping is required could ruin your day! Also I had to be sure that I built both "Left hand" and "Right hand" frame sides! I marked the four plates with a permanent felt tip marker (easily removed with acetone before painting) and started construction.

The barstock was rough cut (with a torch) to length at delivery, leaving the ends rough and lumpy. The bars most all nest closely together so my first task was to cut off the very ends and file off any burrs. The bars were left overly long and the final trimming left until all the holes were drilled and the frame sides trial assembled. This allows you some room for error (front to back) in clamping the bars during the match drilling process.

The bars are drilled for all the assembly and mounting bolts by clamping them in place and drilling them using the punched pilot holes in a plate as a guide. As the inner plates need to have some of the pilot holes left as punched for tapping, I used an outer plate as a guide. The barstock for one side was drilled at a time using the outer plate that they would end up being assembled with. Using the permanent marker I marked the bars on the side that faced the outer plate. This prevented me from both mixing them up side to side and from assembling they flipped 180 degrees. The pilot holes punched in the plates are a #21, the size for a 10-32 tap. The holes in the bars are first drilled through with this size drill and then later they and the plates are drilled for clearance with a #7 drill, except for those holes in the inner plate that are to be left as is for tapping.

I started with positioning and drilling the upper 1/4 inch by 3/4 inch bar, under the assumption that the top of the frame was a more critical reference surface than the bottom for attaching locomotive components. If the edge of the bottom bar was not quite even with the bottom of the frame, less locomotive assembly problems would occur further down the line.

I also added an intermediate step to drilling the bars. I could not just clamp the bar in place and then drill all the holes for it on the drill press. The clamps had to be move frequently to clear the table as drilling progressed. This would bring in the possibility that the bar could shift as the clamps were moved throwing later holes out of alignment. Four of the five bars have holes where flat head screws will be installed. For each bar rather than drilling through all the holes, I first drilled the location of one of these screws (as close to one end as I could get) with the #21 drill, removed the bar and tapped it. The plate was drilled for clearance and a less than full depth countersink was cut. Using a 3/8 10-32 flathead screw the plate and bar were attached. The matching conic surfaces of the screw head and countersink now held the bar in general alignment and all I had to worry about was that it did not rotate around the screw as I moved the clamps.

After the first hole was drilled in the top bar, the rest of the holes in the top bar were drilled using a machinist square to insure that the top of the plate and the top of the bar lined up during clamping. I left the far end clamped as long as possible, then inserted a spare #21 drill to hold the bar in place while shifting this clamp. I would like to mention that care be taken that this spare drill not be positioned over an opening in the table, where for instance it might fall through and inconveniently roll under another piece of equipment. I then tapped and countersunk another flat head screw location at the opposite end from the first to hold the bar in place. This gave a reference surface for positioning the next bar and so on. Again where possible I installed one flat head screw in each bar first, before drilling the rest. One bar does not have any flat head screw locations, but it only has two holes so I used the spare drill in the first hole while drilling the second. Each bar was left in place as a reference to the next and burrs raised by the drilling were cleaned up before continuing. to the next bar.

I used two barclamps to hold the assembly down on the drill press table as each hole was drilled. They were quicker to position and tighten than the small C clamps used to hold the bars in position with the stamped plate. Being bigger they also had a wider throat, giving a better range of clamping positions as the assembly was moved about for drilling. The other advantage they had was that they could be initially closed and tightened with one hand, while the workpiece was held in the other, Not easy with a large C clamp. Removal was even quicker, loosen the screw, let go of it, and the bottom jaw slides down the bar.

After all the #21 holes were drilled the pieces were disassembled and the #7 clearance holes were drilled in the outer plate and bars, including those previously taped in the bars. All the holes in the bars and the outer plate are drilled for clearance, only the inner plate has tapped locations.

All the flat head screw locations on the outer plate were countersunk next. To make this easier I first carefully cut one of the previous shallow countersink holes until the screw head fit flush. With this as a reference, I lowered the table and extended the quill as far down as it would go. The table was then raised until the countersink bit seated in the just cut countersink hole then locked the table in place. Now all that had to be done to cut the rest to the correct depth was to move the plate and cut until the quill bottomed. Each countersink cut was uniform and the proper depth without having to check each one. I used cutting oil during all the countersinking, to both speed the rate of cut and save the cutting edges of the countersink bit. Any remaining burrs were once again removed.

Next the inner plate was tapped and drilled for clearance as required, then the burrs removed. All the pieces were then reassembled and except for trimming the bars later, that side of the frame was finished! The present I am wearing a brace on my "Good" wrist because of Carpal Tunnel problems, and even with this hindrance it took only six hours to complete the one side of the frame.

The other frame side was finished in the same manner. Then the pieces were disassembled, the 1/4 barstock trimmed to length, and the frames sides reassembled to check for proper fit.

The next step is to cut the steel angle pieces for the corners in preparation for drilling the screw holes. The corner material required for the corner pieces is steel angle (looks like it was bent from flat sheet) not angle iron. They were cut oversize for the same reasons as the barstock was. This also allowed clearance room for the clamps used during drilling to hold the parts in place. The angles at the back corners were cut about 1 inch longer than needed (4 1/2 inches) and the ones for the front corners about 2 inches longer (3 inches). The later were so much longer than needed so that the clamps could reach them from the edges of the 4 inch angle plate (the setup is described below).

Figure 9: Minnie frame

The frames were again disassembled (this will be common as the locomotive is built, so the pieces are given a light oil protective coating , and will be cleaned and painted at a later date). When the corner angles are match drilled only the inner plates are used as a guide rather than the entire frame side. This lessens the chance of elongating the holes in the frame pieces, and generally makes an easier job of moving and clamping things. This is especially true as I used the drill press table and when the front corners were being drilled a majority of the frame was hanging in mid-air.

Figure 9 shows the setup I used. The drill press table was used as it provided ample spots to attach clamps and bolts to hold the various pieces down, and was the flattest surface I have besides the lathe bed (it will be a cold day in …., before I start clamping stuff to that!). The angle plate was bolted to the back of the table, and a scrap piece of aluminum plate bolted (where possible) and clamped to the table to extend it a little more. This is not essential, but as long as the plate was available, it helped. The corner piece to be drilled is clamped to the angle plate with the leg to be drilled at the top, parallel to the table/plate surface, as shown in Figure 10. This allows you to drill down through the frame plate into the corner piece. One of the longer corner pieces was clamped to the far end to act as a support and to space the frameplate so it is parallel to the table. This combination keeps the corner piece and the frame plate at right angles to each other and by butting them both up against the angle plate, keeps them in line at the corner. The angle plate in this case is used only as a flat surface to insure that the corner piece and frame plate end line up, the right angle accuracy comes from the corner piece itself. The frame end plate will overlap the frame side plate and sit flush with the outer edge (see the photograph of the assembled corner, Figure 15). With the frame plate also clamped in place (Figure 11) the holes can be drilled. The holes were drilled out with a #7 drill during the construction of the frame sides so I use this size to match drill the corner angles. When it came time to drill out the corner piece that was being used as a support I simply swapped it with an already drilled piece.

After the corners were drilled I reassembled the frame sides and bolted the corners in place and marked them for trimming. The shorter corner angles for the front of the frame (just slightly shorter than 1 inch long after trimming), were too short to be clamped in my bandsaw's vice for the final cut. To solve this problem I clamped the piece to a section of the leftover angle (Figure 12) and sawed through both pieces. This wasted a little stock, but sure beat trying to cut it with a hacksaw!

The corner pieces were deburred and bolted to the reassembled side frames in preparation for drilling the holes to mate with the end plates. The angle plate was removed from the drill press table, but the aluminum plate was left in place. The critical measurements for this operation are that the end plate must line up with the outer edge of the frame side and line up with the top and bottom edges. The accuracy of the right angle is again supplied by the corner piece. I laid two pieces of square keystock on the table/plate to act as spacers. These are required because the screw heads for the corner pieces project above the surface. The frame side is placed on the keystock so that the plate surface (not the screw head) rests on the keystock. This is little hard to see in the photograph, so I drew in a line to show that edge of the frame side as it sits on the keystock. The end plate was then put in position and aligned with the top and bottom edges of the frame side using a machinist's square, as shown in Figure 14. With the frame side and the end piece resting on the same surface of the keystock those edges are automatically lined up. The end plate was clamped in place and the setup rechecked. The mounting holes were then match drilled. The holes in the endplate come punched just a hair under the diameter of a #7 drill. So I again used this size drill for the match drilling process. As with the pieces of the frame sides the end plate was marked to assure proper orientation during assembly. The holes for the other corners were then drilled in a similar manner.

With all the holes deburred the frame was assembled using #10-32 screws and nuts and is shown in Figures 15 (an assembled corner). You will note the markings on the frame sides. The closer one means "Side 2 Outer", the one just visible behind it is "1I" or "Side 1 Inner".

These parts will have to be disassembled from time to time in the future, so no thread locking compounds were used at this point. In fact I used low grade screws and nuts at the corners, as these were cheap and available locally. I will replace them with high grade hardware when the parts are all attached to the frame and I can determine the exact lengths required for the screws.

Rear Axle Mounts

The pieces for the rear axle bearing mounts are shown in Figure 1. The smaller pieces, shown below the larger rear bearing mount plates, fit on either side of the lower frame bar at the bottom of the axle opening. These fit in the area where the frame plates were punched out when they were made.

You will need to have the Driver Axle bearings before starting on the installation of the rear axle plates. This is because the plates need to be in alignment with the outer bearing race, before you work on mounting them. If you align the plates by the outside edges, the inner holes may not be aligned once the plates are fitted to the outer race. When you install the outer races, these plates may shift and throw the mounting holes out of alignment.

The bearings are made by Torrington. They consist of two parts, an inner race part # IR-1612 OH and an outer race with captive needle bearings part # B-2012. I got mine at a local bearing distributor for about $19 for one each set of the two parts. To spread out the cost (I'm also buying tools and parts for other sections at the same time) I bought two sets to start with. This allows me to do the rear axle and the equalizer machining by swapping the bearings between them. One set of the bearings are shown in Figure 2. The outer race is on the left and the inner race on the right.

The holes punched for the bearings are slightly undersize. Bill says that this is inherent in the punching process. This is one of the reasons why you need the bearings first. You could also mount the plates on a lathe or milling machine and bore to holes to size, though such accuracy is not needed for this operation and is therefore a waste of time. After the plates are fitted to the bearings, the plates can be fitted to the frame.

The holes in the Rear Axle plates only need to be machined a little. As shown in Figure 3 below, the outer race fits most of the way through the hole as the plates come delivered. Only the last part of the hole has to be machined or ground to allow the bearing to be pressed in. In the picture I have inserted the bearing using finger pressure only. The plate only has to be opened up so that the race can pass through using your fingers, but without any slop.

Figure 4 shows one of the bearing plates clamped in a drill press vise with square keystock used to raise the plate off the bottom. I used a grinding stone on my Dremel to enlarge to hole (Figure 5). With my variable speed Dremel set to a medium speed I made three rounds on the inside of the hole, about 10 seconds total. I ended up hitting the whole surface, but that was all it took to open the hole. With grinding and deburring all the edges (inside and outside) cleanup only took about 10 minutes for all four rear axle plates.

The bearing fit perfectly in the frame opening, so no modification was needed there, as shown in Figure 6.

The rear journal installation is straight forward. The plates with the larger hole (the ones that were just opened up), have the punched holes larger than the #21 drill used for the initial opening up of the frame holes. I just went ahead and opened the holes on opposite corners with the #7 drill. I also drilled the matching corners on one of the end plates, the one that will end up on the inside of the frame. Figure 7 shows the drill press table with a clamp setup to prevent the plate from spinning should the drill grab while I drilled the holes, thus also saving my hand from possible injury.

I covered both ends of a bearing outer race with masking tape to keep the chips out and installed it in the frame (Figure 8) (Note that this shot is from a later stage of construction). Position the plates (minus the outermost plate which will be taped 10-32) with the bearing installed, and secure them in place with #10 screws and nuts through the corner holes previously drilled. Figure 10 shows the plates bolted together and ready for drilling at the drill press. Clamp the frame to the drill press table and drill through rest of the holes, except for the two middle bottom holes, with the #7 drill. The plates are then removed and deburred.

Note that the picture in Figure 9 was taken when the second set of plates were drilled. The tape over the axle is used to prevent chips from getting into the bearing. I would have been smart to also tape the opening to the other bearing, but got lucky and none got in. When drilling with this setup go lightly with the spindle down feed, the frame will flex under the pressure, so watch as you drill to insure it does not flex enough to throw off the hole. A piece of scrap wood could be cut to fit between the frames and prevent this flexing, and allow faster drilling (again I would have been smart to do this, but the holes came out all right with gentle downfeed pressure).

The drill press is the best way to drill these holes. You can do it with a regular drill, but the holes will all be slightly out of alignment due to the fitting of the bearing race, and this can cause the bit to not be fed evenly. It is difficult to hold the drill steady by hand strength alone should it decide to wander, and likely catch. I tried it both ways and the results with the drill press are easier, quicker, and more accurate!

Tap the holes in two opposite corners of the outer plate, using the tap chucked in the drill press chuck to start the threads straight. Because the bolts will be going through 7/8 of an inch of plates and frame, any error in tapping the holes out of true vertical will be greatly magnified. When we tapped the holes for the fame sides, this was not a problem, but for these holes it can be (I came to this conclusion the hard way). So make sure these two holes are tapped true to vertical. Deburr the outside edges and the tapped holes in the outer plate now. Install the plates and the bearing (remember to keep the tape on the ends of the bearing) and secure with screws in the two tapped outer plate holes. Now tap the remaining outer plate holes (except the two middle bottom holes), by inserting the tap from inside the frame through the screw holes. The holes in the plate will act as guides to insure the threads are true. Figure 10 shows the tap in position to start threading the next hole.

Using the #21 drill, the two middle bottom holes are drilled through the frame (again on the drill press). These holes will be used as guides when fitting the small plates (shown in Figure 1 above). Disassemble and deburr all the holes.

Next we need to fit the small plates to the frame and bearing. Reassemble the plate minus the outer plate and use #10 screws and nuts to hold the plates in position. Using the holes in the frame bar as a guide, grind the curved end of the plate until the holes line up with those in the frame. The curved end of the small plates have long sharp ends left by the punching process. These ends are where most, if not all, of the grinding needs to be done. Grind the plates until the holes line up with those in the frame. Figure 11 shows a raw plate positioned in the slot as far up as it will go, and another raw plate on the left to show the ends that need to be trimmed. Figure 12 shows a fitted small plate. Reinstall the journal plates and repeat for the other side, leaving off the inner most plate this time. When both small plates are fitted reinstall all but the outermost plate and drill out the holes with the #7 drill, tap the outer plate holes as above, deburr, and install all the plates and bolts.

Figure 13 shows the finished plates with a piece of axle stock installed which is also held in position by a bearing set in the frame opening on the outer side.

Repeat the above steps for the other side, but additionally use a piece of axle stock fit in both bearings in all the steps, to insure that the bearings are lined up, with all the plates fitted.

When you are finished installing both rear axle mounts, disassemble the mounts and both side frames. Clean out all the metal chips, and reassemble the parts. Because the side frames are hollow and open in some areas, you may have to do this a few times as the locomotive construction progresses.


Equalizer

The frame for the front axle equalizer, minus the supplied bearing plates, is shown in Figure 1. The equalizer comes already welded and with the holes pre-punched as shown. In some of the pictures the equalizer shown is an earlier design (the bottom of the outer plates are closed rather than open). Figure 1A shows the old design with the bearing plates installed. The new design uses the same plates. All the frame kits will have the new design as delivered, according to Bill Oberpriller. The two designs are otherwise identical and the construction steps the same. For this reason I did not reshoot the pictures.

I fabricated the equalizer pivot and mounts first. The equalizer as delivered has a 1/2 inch hole punched to accept the pivot. Drill bits make a hole that is close to the marked size, but varies from that size by a few thousandths. So I made the mounts first and turned the pivot to fit them. I made the pivot assembly as shown with a change to the pivot itself, then made further changes when I had finished. I'll describe the construction as I first made the parts, and then describe the modifications.

The purpose of the pivot is to hold the equalizer in place side to side and allow the axle to swivel horizontally as the drivers move up and down with any irregularities in the track. The front to back forces on the axle are controlled by the fit between the axle journals and the frame. A close fit between the pivot and the equalizer is not needed or desired. About 0.005" slop is fine. As bolts are about that much under size, a 1/2 inch bolt can be used as the pivot stock. The smooth surface of the bolt also provides a good bearing area.

Two pieces of 1 by 1/8 inch steel angle (the same as was used in the frame) about an inch longer than in the drawing were cut for the mounts. This allows for adjustment when mounting them to the frame. The ends will be trimmed later. I mounted them for drilling as shown in Figure 3. The two pieces are clamped while siting on a flat surface so that the bottom legs are aligned, then the parts are clamped to the angle plate. Though it is not clear in the photo, I have marked the location for the pivot hole using blue marking dye (some of which can be seen as the blue blot in the corner of the angle). This setup insures that the holes are in alignment with each other and perpendicular to the bottom legs. I drilled a pilot hole and then drilled with a 23/64 inch drill. This was followed with a 3/8 inch reamer. I used the reamer simply because I had one available. The hole could have just been drilled with a 3/8" drill bit instead.

Next I turned the pivot. Instead of mounting with the 1/4 inch bolts, I turned the pivot to accept 3/8 inch nuts. This was a simpler job than in Bill's design, though either will work. The partially completed pivot is shown in Figure 4. I turned it from 3/4 inch HRS bar, rather than a 1/2 inch bolt simply because of a lack of a suitable bolt when I started (I swear that long 1/2" bolt in the scrap box had nothing to do with this decision :-> ). I first roughed it out with the areas to be threaded smaller than 1/2 inch so I could trial fit the bearing area to the equalizer opening. The bearing area was also left a little longer than the 2 inch final length plus twice the thickness of the angle stock mounts. This area was turned last for the locating shoulders. After turning this section to a lose sliding fit I smoothed it with a file to provide a better bearing surface.

Next, both the areas for the 3/8 threads were turned down, leaving them a little thick. A short section of the tailstock end of the bar was then turned until a close fit to the angle stock mount was obtained (3/8 inch +). The rest of this section up to the start of the locating shoulder, was then turned using this setting. The "V" form carbide bit I was using was switched to a square shouldered one. I then roughed in the locating shoulder area. Next the bit was located against the previously turned surface and backed off 0.0025 inch (to provide a 0.005 inch interference fit with the mount hole). I then finish turned the shoulder to a length slightly shorter than the thickness of the angle stock. The threaded area, if a little thicker than 3/8 inch, can then be reduced to the correct diameter for threading. Using the measurements from this section the shoulder and threaded area for the section at the headstock end were then finish turned. During the finish turning of the second shoulder is when the pivot bearing area is brought to the 2 inch final length.

The exposed tailstock end was then threaded using a 3/8-16 NC die. Alternatively a 3/8-24 NF thread could be cut. The fine threads are actually stronger than the course and would, therefore, be preferred. The availability of the fine thread nuts and/or die (or lack there of) may dictate the choice. In my case I ended up using the course threads. I first placed a couple of washers over the shoulder to insure that I did not run the die into this area. The die was started using the tailstock ram to position the die square with the stock and also used to apply pressure to help start the first few threads. This is shown in Figure 5. My die has a hex body so I use a wrench to turn it. A standard round die will require a holder. I put the lathe in the highest gear and locked in the backgears to hold the chuck and the stock while I was turning the die. I also placed a piece of plywood over the ways to protect them from a falling wrench or die. Always do this when such operations are being done!! A dinged bedway will not improve the accuracy of your lathe, and does not do a whole lot for your day either!

Using thread cutting oil I ran the die up until it touched the protective washers. This leaves a section unthreaded or partially threaded by the washers. This is inherent in all dies, which like taps have a short section of partially shallow threads that act as a guide when starting the operation. To finish the threads I turned the die around so that the full thread area was toward the shoulder and ran the die back up. With the die and washers removed I then used a file to clean up the end of the threads and any burs raised by the threading or machining.

With one end finished I remove the workpiece and cut it from the bar. The piece was then returned to the lathe and the cut cleaned up. That end was then threaded and deburred like the first.

This completed the pivot and mount, next fitting the mounts to the frame would have been done. However, while rooting in my parts drawer I came across a nice 1/2 inch OD X 3/8 inch ID bronze bearing. The pivot hole in the equalizer is punched in the same manner as the other frame pieces. The parts are then stacked and welded. While in alignment after welding, they do not provide a seamless totally smooth hole. I decided that the bronze bearing would provide a much better bearing surface. The OD of the bearing is slightly over size so that it can be pressed into a 1/2" nominal hole without additional securing needed. So the fitting to the equalizer is simple, but now I had to make new mounts and pivot.

To press the bearing into the equalizer I used a 3/8 inch bolt, washers and a nut. The bearing was placed on the bolt with a washer at the bolt head end. The bolt/bearing assembly is then inserted through the equalizer hole and a washer and nut installed. With the bearing aligned to the hole the nut is tightened and the bearing will be pulled into the hole as the bolt head is pulled toward the nut. Figure 6 shows the parts ready for inserting the bearing. In my case the bearing was longer than the depth of the hole. When the bearing bottomed on the washer at the nut end, I removed the nut and washer and placed a socket who's opening was larger than the bearing OD over the bolt. With the nut and washer reinstalled the assembly was tightened until the bearing's shoulder touched the equalizer bar. Figure 7 shows the installed bearing.

To fit the new equalizer bearing a new 3/8 inch maximum diameter pivot was needed. To keep the locating shoulders I reduced them from the original 3/8 inch to 1/4 inch diameter and the threaded portion to 1/4"-28. I discussed this with Bill Oberpriller first to insure that the final parts would be strong enough for this application. This of course necessitated the fabrication of new mounts with a 1/4 inch rather than 3/8 inch hole. The steps were basically the same, but with a few differences. In this case I did not have a 1/4 inch reamer so 1/4 inch drilled holes were used in the mounts. I used a 3/8 inch bolt as starting stock this time. The thinner bolt required that I use a tailstock center to support the end of the bolt during machining. A photo shot during the machining of this pivot is shown in Figure 8.

Figure 9 shows the new pivot and mounts set on the frame. You will see that one of the mounts has a 3/8 inch hole in the base leg. I did not have enough angle left for two new mounts, so I reused one of the original mounts for a new one. The next time I get to the hardware store, I will get another length of angle and replace this mount. I may have to remake both mounts, but with the 0.005 inch extra diameter on the pivot shoulder, I should not have to make another pivot. You will also see that I have not drilled the holes for attaching the mounts to the frame. One of the future kits will be the smoke box saddle. This fits inside the frame and against it, and is an additional part that holds the frame in correct alignment and spacing. Rather than drill the pivot mount to frame holes now I will wait until I have the saddle installed. I would hate to find that the mount holes were off by 1/32 inch or so! It is much easier to match drill these holes when everything is correct, than to redrill the mounts for a new hole.

Before starting on the fitting of the axles to the equalizer the top bar on the frame must be notched out to match the cut-out in the frame so that the equalizer will pivot freely up and down approximately 3/16 to 1/4 inch. This is done easily on a mill, but with only a lathe, it is more difficult. I plan to clamp the bars (one at a time) to an angle plate mounted in place of the toolpost, with the bottom of the bar facing the headstock. The bar centerline will be at the lathe centerline. A 1/2 inch endmill will be gripped in the chuck. This will leave concave ends in the slot, which will be cleaned up with a file.

The next steps are to fit the equalizer journals to the frame. As with the Rear Axle Plates, you will need to have the Driver Axle Bearings first!

First the bearing journal plates are fitted to the bearings as was done for the rear axle. Next the front equalizer needs to be fit to the frame. This should be a free but not sloppy fit. The equalizer should be free to pivot, with the sliding fit to the frame not allowing any great front to back motion. Bill Oberpriller used a belt sander to reduce his to fit. I may do that, or maybe turn mine down on the lathe, assuming I can come up with a good way to mount it to the faceplate.

Rear (Cab) Frame

Minnie's frame comes in two major parts. The first is the main frame already detailed in the previous sections. The second is the rear frame that supports the engine cab and the rear of the boiler, and additionally makes up part of the trailing truck assembly. Figure 1 shows a picture of the completed rear frame.

As with the front frame kit, care must be taken that all the parts are square and true, otherwise the trailing truck will not move freely as it should.

Figure 2 shows the parts for the rear frame and the front apron. At the bottom are the parts for the side frames and the internal bars. The thicker bars over the side frame plates are the top bars, those below are the rest of the side frame bars. These bars need to be cut into several sections, as detailed later, for installation. The notches in the side plates are for the trailing truck mount. In the upper left are the plates and one of the bars for the "front" of the rear frame and to the right the plate that forms the rear most part of the frame. The large plate at the top left is the front apron plate. Its installation is detailed in the pilot truck section.

The bar placement for the rear frame front and side frame assemblies are shown in Figure 3. The only place that the flat head screws need to be placed are the four screw holes in the vertical green bars, the rest can be round head screws. These locations are also used for mounting various equipment like boiler supports, the ash pan, etc. I will match drill with the #21 drill only for most of these holes, and then finish them as the rest of the equipment is installed.

The blue bars in the figure above are 1/4 by 1 inch, the red 1/4 by 3/4 inch, and the green 1/4 by 1/2 inch bar stock. The four holes through the 1/4 by 1/2 inch (green) bar stock and frames are the only holes that require flat head screws.

The bolt locations that the front frame's rear plate use to bolt to the steel angle corner are also used to tie the front and rear frame halves together, with bolts that will also pass through matching holes in the rear frame's front plate. As I felt that this should be a fairly close tolerance fit, I decided to use a #10 rather than a #7 drill for the clearance holes. I can always go back and enlarge the holes later if needed.

Because the locomotive is still being designed I decided to match drill all the bars with the #21 drill only at this point, except for those holes I knew were going the use a certain type of screw. I also will not tap any of the these holes either until I go to mount the associated assemblies. This gives me the maximum flexibility as construction progresses. The holes I did open up are those used to tie the front and rear frames together, the holes that are used to secure the rear frame's corner angles, and the four holes on each side of the trailing truck journal slots. I am using temporary #6-32 bolts in the remaining holes for the present to hold the bars in place and the punched plates in line. The #6 screws will fit in a #21 hole.

Notice the circled holes in the plate, in Figure 4. These are the ones that secure the corner angles and tie the front and rear frames together. These will be match drilled and then opened up with the #10 drill. The rest of the holes will be match drilled (#21 drill) only, and then the #6 screws used to hold the bars and plates together.

Figure 5 shows the front frame plate for the rear frame clamped and ready for drilling the first hole (the hole first drilled is one of the ones that will tie the front and rear frame together. As with the drilling of the front frame plates, I first drilled one hole with the #21 drill, then tapped the bar for a 10-32 screw. The matching hole in the plate was drilled for clearance with a #10 drill (not the #7 used on the front frame plates). This hole location will not be countersunk. The bar and plate were then reassembled, using a 3/8 inch long 10-32 flathead screw. The #10 hole is large enough for the conical back of the screw head to center in.

A second location on that bar was then drilled tapped and had a flathead screw inserted to hold the bar in alignment while the remaining holes were drilled. The holes for the lower bar were then drilled.

The side plates and bars were drilled and assembled in a similar manner, again opening up only those holes for the corner angles and the four flathead screw locations. Figure 6 shows one of the raw side plates with the relevant holes marked.

The upper bar of the side frame was installed first, with securing screws installed at the marked locations at either end.

Next I cut two pieces from the 1/4 by 1/2 inch bar for the two vertical green bars in Figure 3. These bars need to be installed as flush with the inner side of the slot as possible. They, and the plate edge, will be part of the bearing surface of the trailing truck journals. As the location of these bars makes clamping them difficult, I switched to a different holding method, superglue.

Figure 7 shows a bottle of Gap Filling superglue and an aerosol bottle of "Kicker". The kicker is sprayed on the glued joint to speed the setting process. Go to a hobby shop and get a "real" bottle of glue and the kicker, the small vials sold in the department stores are very expensive for what you get, too thin (watery) for this job, and they do not sell the kicker. A small bottle of both glue and kicker are all you will need.

The gap filling superglue is thicker than the regular type so as to have some body to hold the glue in the less than perfect joint. The plates are slightly bowed, by the punching process, across the narrow part of the notch legs, and even with the gap filling glue, the joint will be fairly weak, so handle the parts gently during machining. It is very important to clamp the parts on the drill press table as close to the hole being drilled as possible, to further support the joint. The forces on the bar as the drill cuts through the back can break the joint loose if not counteracted. If this occurs, simply finish drilling through the bar by itself, tap the hole, drill the plate with the #10 drill, install a retaining screw, and reassemble the parts with more glue used to insure the alignment during the drilling of the second hole.

First both parts were cleaned and degreased. To setup for gluing the bar in place, and in the proper alignment, I clamped the outer plate to the drill press table with the inside up and the slot facing to the rear. One of the remaining bars was then secured tight against the inside edge and also clamped. The edge of this bar served as the datum surface for aligning the 1/4 by 1/2 inch bar. Figure 8 shows this setup, with the 1/4 by 1/2 inch bar laid in place to test the setup for fit.

Superglue was then applied in a wavy bead to the plate where the bar would be attached. I was careful to keep the glue away from the alignment bar and the holes, remembering that it would spread once the bar was placed. I found no great need to create a solid mass attached to the table! The mating surface of the bar was then given a light spray of the kicker, and the bar pressed in place against the datum bar. After a few seconds, when the glue had set, the datum bar and the plate/bar assembly were removed, to insure that they could be separated. The superglue joint is set but still weak for the first few seconds, so the parts can be pulled apart should the glue have gotten were it was not wanted.

I let the joint set for a few minutes, then clamped the parts on the table and drilled the holes. I was able to drill both holes on one side without the joint failing, but the other side I had to go the screw and second glue joint route. When the holes were finished I tapped both holes in each bar 10-32. The matching holes in the plate were opened with the #10 drill, and countersunk for the flathead screws. These screws have to be set a little below the surface, so that the trailing truck journals can slide over them. All the burrs on the parts were cleaned up. The bars were then attached to the plate, so that the rest of the bars could be fitted.

The 1/4 by 3/4 inch bar stock used for the bottom bars needs to be cut into three pieces, as shown in Figure 2. I started with the two smaller pieces. It is a lot easier to cut two short pieces from a long bar, than to trim or separate two short pieces. With my imported saw the vice jaws stop about 1" from the blade, so short pieces are even harder to work with! Using the installed 1/4 by 1/2 inch bars as a guide the two short pieces were cut and drilled. The right most bar was machined first. The hole on the edge is one that will be drilled for the corner brackets, so this hole was done first with the #21 drill, then tapped 10-32 for a screw. With the hole in the plate opened with the #10 drill the parts were reassembled and the other hole drilled. For now a 6-32 screw will be used in this second hole to hold the bar in place, so after deburring, this part was set aside. The center bar was then finished, again leaving both the plate and bar holes #21.

The left hand bar needs to have the ends cut at an angle to fit against the slot bars, and at the plate edge. While the angles could be determined and the bars marked and cut to match, there is a simpler way. The plate was clamped to the table, bar side up. The barstock was then placed with one end (still square) pushed against the slot barstock. This bar was then also clamped. Using a piece of keystock (any piece with smooth parallel sides would work), held against the slot bar edge as a guide, the other side was used as a guide to mark the cutting line on the bottom bar. The keystock provides a line parallel to the slot bar, but offset enough to clear the gap between the square end of the bar to be marked. Figure 10 shows the setup, with the awl ready for scratching the line.

The bandsaw vise was then adjusted to the correct angle using the comparison of the blade and marked line as references. To save setup time it would be best to have both sideplates ready for the installation of both these bars. That way both ends of each bar can be cut (both need the same angle), in one setting. Otherwise you need to go through this process returning the vise to the square position in-between. Unfortunately I thought of this later! I had an additional problem in doing this, as will be detailed later, and only managed to cut one end of one bar at this time.

The holes for this bar were then drilled leaving the two inner holes at #21 and the hole at the small end of the plate fitted with a 10-32 flathead securing screw.

The parts were then disassembled, the tapped bar locations were then drilled out with the #10 drill. The inner plate was then drilled at the corner bracket locations #10, and the four slot bar holes tapped 10-32. The burrs were cleaned up, and the frame assembled. At the locations drilled #21 only the 6-32 screws with washers and nuts were installed to hold the bars in place, and pull the punched plates together against the inner bars. Figure 12 shows the "finished" front and side plate, ready for the steel angles to be drilled and installed (the small stub to the right of the side plate is part of the block used to brace the part level for the photo, not part of the assembly). You will notice that I have not finished trimming the bars in this photo. The bandsaw blade broke, and I decided to leave this trimming for later. This was a small mistake. The bottom bar of the angled section fits right up against the bottom of the top bar. By leaving the small stub of the top bar, the lower bar was displaced a little downward. This was not a significant amount, so I left it as is. Trim your bar.

The corner bracket was attached to the side plate using a different method than for the front frame. I found that when using the hand drill to match drill the hole for the corner brackets, I had enlarged some of the holes as the drill bucked a little back and forth. Some of these holes were made visibly oblong. For the rear frame I disassembled the side plates, and used only the inner plate as a drilling guide. Figure 13 shows this setup. The rear corner brackets were then match drilled.

As the front frame plate extends past the joint, a slightly different clamping setup was used, as shown in Figures 14 and 15. The step in the front plate prevented me from running the locating bar across the front of the side plate, so two bars were run endwise as shown, to locate the parts. In Figure 15, you will notice that I attached the corner bracket slightly misaligned. I went back and made a new corner bracket before continuing, but I had already taken this picture. In addition before doing the actual drilling I disassembled the front plate and used only the inner plate as a drill guide.

The frame parts were then reassembled and bolted to the flat aluminum plate and the drill press table, in preparation for match drilling the rear plate. Figure 16 shows a view of the setup from the rear plate view, and Figure 17 shows it from the front plate end. As can be seen I used angle plates (one on each side) to insure that the sideplates were both aligned vertically. A 12 inch dial caliper was used to locate the rear of the side plates 10.5 inches apart (the same as at the front). The rear plate was then clamped with the corners of the angled sections centered between the side frame ends. In Figure 16 you can see the caliper in place for the measurement. The piece of tape in the picture was used to make sure the caliper would not fall off while I was taking the photo. The caliper was removed after all the clamps were tightened, and before the holes were drilled.

Figure 18 is the picture of the completed frame. You will note that I used the flathead screws to secure this plate. In addition I tapped the rear corner brackets 10-32 at these location, rather than using a nut and bolt. There were two reasons for this. The screws will be visible on the finished locomotive, and the flathead screws look better than roundhead screws. The other reason was that the conical back of the flathead screws help to keep these joints in alignment and thus help keep the side plates in place. If the sideplates shift, the trailing truck journals might bind in the slides.