486 Gets A New Oil Tank: Difference between revisions

From IBLS
Jump to navigation Jump to search
No edit summary
No edit summary
Line 7: Line 7:
File:Mogul Oil Tank Test Assembly.jpg|The cut components were test fit together.  The corners were taped together using packing tape.  This was used as a model for other tanks as they were welded together.
File:Mogul Oil Tank Test Assembly.jpg|The cut components were test fit together.  The corners were taped together using packing tape.  This was used as a model for other tanks as they were welded together.
File:Allen Mogul Oil Tank Test Fit1.jpg|The temporarily constructed oil tank is tested for fit in the Allen Mogul tender.
File:Allen Mogul Oil Tank Test Fit1.jpg|The temporarily constructed oil tank is tested for fit in the Allen Mogul tender.
File:Allen Mogul Oil Tank Test Fit2.jpg|A different view of the test fit.
File:Completed Mogul Oil Tank.jpg|A fresh coat of paint completes the construction of the oil tank.
File:Completed Mogul Oil Tank.jpg|A fresh coat of paint completes the construction of the oil tank.
</gallery>
</gallery>

Revision as of 00:14, 16 April 2015