File:CabooseTruck BrakeShaftAssmbyClean.jpg: Difference between revisions

From IBLS
Jump to navigation Jump to search
(The Brake Shaft assembly is cleaned after welding. Note that a temporary lever has been inserted and pinned between the two Brake Shaft Struts to help hold the gap during welding. Photo by Daris A Nevil, July 2015.)
 
(No difference)

Latest revision as of 00:02, 28 October 2015

The Brake Shaft assembly is cleaned after welding. Note that a temporary lever has been inserted and pinned between the two Brake Shaft Struts to help hold the gap during welding. Photo by Daris A Nevil, July 2015.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current00:02, 28 October 2015Thumbnail for version as of 00:02, 28 October 20153,264 × 2,448 (2.44 MB)Dnevil (talk | contribs)The Brake Shaft assembly is cleaned after welding. Note that a temporary lever has been inserted and pinned between the two Brake Shaft Struts to help hold the gap during welding. Photo by Daris A Nevil, July 2015.

The following page uses this file:

Metadata