Building a Kitsap Caboose: Difference between revisions

From IBLS
Jump to navigation Jump to search
Line 45: Line 45:
File:KitsapCabooseBatteryBox5.jpg|The front brace is welded in place.  Other components shown here include the terminal strip and the fuse holder.
File:KitsapCabooseBatteryBox5.jpg|The front brace is welded in place.  Other components shown here include the terminal strip and the fuse holder.
File:KitsapCabooseBatteryBox6.jpg|The terminal strip and fuse holder have been mounted on the side of the battery box.  I made a mistake here, in that I mounted the terminal strip on the side where the air tank will reside.  Not much access room after the battery box and air tank are mounted next to each other.
File:KitsapCabooseBatteryBox6.jpg|The terminal strip and fuse holder have been mounted on the side of the battery box.  I made a mistake here, in that I mounted the terminal strip on the side where the air tank will reside.  Not much access room after the battery box and air tank are mounted next to each other.
File:KitsapCabooseBatteryBox7.jpg|The battery box has been welded onto the caboose chassis.  The mounting brackets are 1/2 by 1/2 inch angle steel.
File:KitsapCabooseBatteryBox7.jpg|The battery box has been welded onto the caboose chassis.  The mounting brackets are 1/2 by 1/2 inch angle steel.  Two holes were drilled through the top of the two front braces through which #5-40 bolts are inserted, and screw into matching tapped holes in the front support brace.
</gallery>
</gallery>

Revision as of 19:57, 13 September 2015


by Daris A Nevil

Build Gallery

Frame

Body

Battery Box