Building a Kitsap Caboose: Difference between revisions

From IBLS
Jump to navigation Jump to search
No edit summary
No edit summary
Line 7: Line 7:
File:Kitsap Live Steamers 2.jpg|The floor plats have been welded to the side beams.  The center beam and bolster supports have been attached as well.  The end beam has been welded to the end of the floor and the coupler pocket.  The half rounds were previously brazed on the end beam.
File:Kitsap Live Steamers 2.jpg|The floor plats have been welded to the side beams.  The center beam and bolster supports have been attached as well.  The end beam has been welded to the end of the floor and the coupler pocket.  The half rounds were previously brazed on the end beam.
File:Kitasp Live Steamers Caboose 3.jpg|Top view of floor plats showing "stitch" welds.
File:Kitasp Live Steamers Caboose 3.jpg|Top view of floor plats showing "stitch" welds.
File:Kitsap Live Steamers Caboose 4.jpg|Bottom view of the floor shows stitch welds.  These welds were made using a Lincoln "tombstone" welder with 1/8 inch 6011 rods.
File:Kitsap Live Steamers Caboose 4.jpg|Bottom view of the floor shows stitch welds.  These welds were made using a red Lincoln "tombstone" welder (seen under the table) with 1/8 inch 6011 rods.
</gallery>
</gallery>

Revision as of 23:54, 14 June 2015


by Daris A Nevil