File:2020-11-28 11.35.17.jpg

From IBLS
Jump to navigation Jump to search

Original file(3,024 × 4,032 pixels, file size: 5.98 MB, MIME type: image/jpeg)

Step 3: The gap in the rail is staggered to prevent sagging over time. Two screws are used to attached the end of the rail in the middle of the tie place on the third tie from the end. Do this on both ends. A welding clamp is used to hold these two ties in place. Photo by Daris A Nevil, November 2020.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current17:27, 29 November 2020Thumbnail for version as of 17:27, 29 November 20203,024 × 4,032 (5.98 MB)Dnevil (talk | contribs)Step 3: The gap in the rail is staggered to prevent sagging over time. Two screws are used to attached the end of the rail in the middle of the tie place on the third tie from the end. Do this on both ends. A welding clamp is used to hold these two...

The following page uses this file:

Metadata